Genesis Tillage™, Inc. 


 


 

Home
Back to New Machines
New Machines
Pricing
Results
Testimonials
Helix Design
Design Features
Gen-I vs Gen-II Tines
How It Works
Brochure
Upcoming Farm Shows
Contact Us

 

 

Tine Installation Instructions for

Gen-Till I™ Tines

 
 


TYPICAL TINE INSTALLATION:
For rear offset swingarm assemblies (AerWay since 1986)
{This is the left-hand side viewed from the rear of the machine.}
For Genesis Tillage Innovations Gen-Till and Gen-Till PLUS machines and early production AerWay with forward offset swingarms this is the inboard end of the right-hand roller assembly.
Welded ring is to outside of the machine center or outer section of wing unit. Head of tine bolt with flat washer
and writing on back of tine on welded ring. Do not place washer under top lock nut. Always final tighten from the head of the bolt end. Torque to about 110ft.lbs. Be sure the nut threads are full of bolt.
 

KEY THOUGHT HERE:  ALWAYS ASSEMBLE SO THAT WELDED RING IS SUPPORTING THE THRUST FORCE APPLIED TO THE TINE.

 


Left-Hand Helix on rf/lr roller (shaft rotates counter-clockwise)
This is the correct assembly for the left-hand roller on a rear offset machine or for the
 right-hand roller on the forward offset machine such as the Gen-Till.

 


Same left-hand helix looking from the opposite end of the roller shaft.
The shaft is rotating clockwise in this picture.
 

 

 

 

   

For more information or to purchase Gen-TillTM products
Call: 1-866-773-2730
or e-mail
info@genesistillage.com